Bridge (ID- 3244 ) Inventory Report

Gorpa at Km 4 On Chainage 3.500 of Kot Randhar Badhani tall motor road (Mayali Randhar motor road) (VR)

Data finalized On 20 May 2024

By Satpal Rangar

Last Rated On 09 Jul 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : PD Rudraprayag

General

Bridge Type : Motor Bridge High Level
Structure No : 4/1
Feature Intersected : Lastargaad
Name of Bridge : Gorpa at Km 4
Nearest Town : Mayali
Latitude (Northing) : 30.46500000
Longitude (Easting) : 78.91888900
Construction Year : 2015
Inventory Year : 2023
Work Code(s) : --

Geometric

Overall length (in meter) : 48.00
Total No of Span : 1
Maximuam Span (in meter) : 48.00
Span Arragment : 1x48
No of Lane : 1.000
Overall Width (m) : 5.500
Carriageway Width (m) : 3.750
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided