Bridge (ID- 3260 ) Inventory Report

Hadawaha Nala On Chainage 14.700 of Roorkee Landhora Laksar Balawali state highway

Data finalized On 06 Dec 2023

By Er Balendra Singh AAE

Last Rated On 25 May 2024

Rating 0.36%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : CD Laksar

General

Bridge Type : Motor Bridge High Level
Structure No : 0
Feature Intersected : Hadawaha Nala
Name of Bridge : Hadawaha Nala
Nearest Town : Laksar
Latitude (Northing) : 29.77158600
Longitude (Easting) : 78.00744900
Construction Year : 1980
Inventory Year : 2023

Geometric

Overall length (in meter) : 29.02
Total No of Span : 1
Maximuam Span (in meter) : 29.02
Span Arragment : 1x29.02
No of Lane : 2.000
Overall Width (m) : 8.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 8.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Well
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Protection work done in Plum Concert but fully Damaged Presently
Bank Protection Right Side of Up-stream : Protection work done in Plum Concert but fully Damaged Presently
Bank Protection Left Side of Down-stream : Protection work done in Plum Concert but fully Damaged Presently
Bank Protection Right Side of Down-stream : Protection work done in Plum Concert but fully Damaged Presently
Floor Protection on Up-stream : Protection work done in Plum Concert but fully Damaged Presently
Floor Protection on Down-stream : Protection work done in Plum Concert but fully Damaged Presently
Tratment for Corrosion Protection (if any) : no special treatment provided