Bridge (ID- 3277 ) Inventory Report

Ramganga Bridge On Chainage 62.900 of starting from its junction with NH -74 near kashipur connecting Ramnager Dhumakot Thalisain Tripalisain Pabo and Terminating at NH 119 near Bubakhal National Highway

Data finalized On 21 Dec 2023

By Ravindra krishn jalal

Last Rated On 15 Dec 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : NH Haldwani

General

Bridge Type : Motor Bridge High Level
Structure No : 62/5
Feature Intersected : Ramganga River
Name of Bridge : Ramganga Bridge
Nearest Town : Marchula
Latitude (Northing) : 29.60589400
Longitude (Easting) : 79.09262100
Construction Year : 1971
Inventory Year : 2020

Geometric

Overall length (in meter) : 69.00
Total No of Span : 1
Maximuam Span (in meter) : 69.00
Span Arragment : 1x69
No of Lane : 1.000
Overall Width (m) : 4.250
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided