Bridge (ID- 3281 ) Inventory Report

Feeder canal On Chainage 3.600 of starting from its junction with NH -74 near kashipur connecting Ramnager Dhumakot Thalisain Tripalisain Pabo and Terminating at NH 119 near Bubakhal National Highway

Data Yet Not Finalized

Last Rated On 20 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : NH Haldwani

General

Bridge Type : Motor Bridge High Level
Structure No : 4/2
Feature Intersected : Local canal
Name of Bridge : Feeder canal
Nearest Town : Kashipur
Latitude (Northing) : 29.23587670
Longitude (Easting) : 78.97985790
Construction Year : 2000
Inventory Year : 2023

Geometric

Overall length (in meter) : 9.20
Total No of Span : 1
Maximuam Span (in meter) : 6.60
Span Arragment : 1x6.6
No of Lane : 2.000
Overall Width (m) : 6.600
Carriageway Width (m) : 9.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 9.600
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Not Provided
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Brick Masonry
Pier Type : Brick Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : Cement concrete
Floor Protection on Down-stream : Cement concrete
Tratment for Corrosion Protection (if any) : Not provided