Bridge (ID- 3286 ) Inventory Report

nail Kumoli pedestrain Bridge in Silkot Gadhera On Chainage 2.800 of Rikholi Nail Jagri Sera motor road

Data finalized On 04 Jan 2024

By asha

Last Rated On 07 Jun 2024

Rating 0.60%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Gairsain

General

Bridge Type : Pedestrain Bridge
Structure No : 3.000
Feature Intersected : Silkot Gadhera
Name of Bridge : nail Kumoli pedestrain Bridge in Silkot Gadhera
Nearest Town : Nail Kumoli
Latitude (Northing) : 30.05808200
Longitude (Easting) : 79.27085200
Construction Year : 2016
Inventory Year : 2023

Geometric

Overall length (in meter) : 17.00
Total No of Span : 1
Maximuam Span (in meter) : 17.00
Span Arragment : 1x17.00
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 1.800
LS Footpath Width (m) : 1.800
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided