Bridge (ID- 3293 ) Inventory Report

Dharam ganga River bridge Budhakedar On Chainage 34.775 of Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway (SH)

Data Yet Not Finalized

Last Rated On 18 Jun 2026

Rating 1.07%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Ghansali

General

Bridge Type : Motor Bridge High Level
Structure No : 1
Feature Intersected : Dharam Ganga
Name of Bridge : Dharam ganga River bridge Budhakedar
Nearest Town : Budhakedar
Latitude (Northing) : 30.57692200
Longitude (Easting) : 78.64504400
Construction Year : 2000
Inventory Year : 2012
Work Code(s) : ADB

Geometric

Overall length (in meter) : 36.00
Total No of Span : 1
Maximuam Span (in meter) : 36.00
Span Arragment : 1*36
No of Lane : 1.000
Overall Width (m) : 5.500
Carriageway Width (m) : 4.100
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 7
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided