Bridge (ID- 3301 ) Inventory Report

Sumarth Gadera On Chainage 109.230 of Uttarkashi Ghansali Tilwara state highway

Data Yet Not Finalized

Last Rated On 24 Dec 2024

Rating 0.76%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Ghansaali

General

Bridge Type : Motor Bridge High Level
Structure No : 4
Feature Intersected : Sumarth Gadera
Name of Bridge : Sumarth Gadera
Nearest Town : Sumarth
Latitude (Northing) : 30.30000000
Longitude (Easting) : 78.30000000
Construction Year : 1965
Inventory Year : 2012

Geometric

Overall length (in meter) : 24.50
Total No of Span : 8
Maximuam Span (in meter) : 6.00
Span Arragment : 1-24
No of Lane : 1.000
Overall Width (m) : 4.300
Carriageway Width (m) : 4.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 8.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments : 8.000
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 8
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided