Bridge (ID- 3342 ) Inventory Report

Old Pathri Roh Bridge On Chainage 33.350 of Purkazi Laksar Haridwar national highway

Data finalized On 03 Jan 2024

By Mahabir Lal

Last Rated On 01 Jan 2024

Rating 28.25%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : NH Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 34/2
Feature Intersected : Pathri Roh River
Name of Bridge : Old Pathri Roh Bridge
Nearest Town : Laksar
Latitude (Northing) : 29.75972222
Longitude (Easting) : 78.06993333
Construction Year : 1965
Inventory Year : 2023

Geometric

Overall length (in meter) : 90.10
Total No of Span : 5
Maximuam Span (in meter) : 22.90
Span Arragment : 1x10.70+3x22.90+1x10.70
No of Lane : 2.000
Overall Width (m) : 7.500
Carriageway Width (m) : 6.900
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 10.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 105.000
OFL Ordinary Flood Level : 102.000
LWL Low Water Level : 100.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Severe
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Arch
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 4
Abutment Type : other
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided