Bridge (ID- 3343 ) Inventory Report

Chilond STEEL TRUSS Bridge 70m

Data finalized On 20 Dec 2023

By Er Sayed Tokeer Aalam

Last Rated On 11 Jun 2024

Rating 0.30%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Ukhimath

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Sarswati
Name of Bridge : Chilond STEEL TRUSS Bridge 70m
Nearest Town : CHILOND
Latitude (Northing) : 30.60105400
Longitude (Easting) : 79.07895300
Construction Year : 2018
Inventory Year : 2023

Geometric

Overall length (in meter) : 70.00
Total No of Span : 1
Maximuam Span (in meter) : 70.00
Span Arragment : 1X70M
No of Lane : 1.000
Overall Width (m) : 3.000
Carriageway Width (m) : 2.750
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1566.000
OFL Ordinary Flood Level : 1558.000
LWL Low Water Level : 1556.500
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 1574.000
Road Level at Centre : 1574.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.2
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided