Bridge (ID- 3362 ) Inventory Report

Pedistrain Bridle Bridge on sonprayag triyuginarayan bridle road On Chainage 3.825 of Sonprayag Triyuginarayan Bridle Road (BR)

Data Yet Not Finalized

Last Rated On 03 Jul 2026

Rating 2.07%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Ukhimath

General

Bridge Type : Pedestrain Bridge
Structure No : 2/3
Feature Intersected : Gavadi Ghedera
Name of Bridge : Pedistrain Bridle Bridge on sonprayag triyuginarayan bridle road
Nearest Town : sonparyag
Latitude (Northing) : 30.63602600
Longitude (Easting) : 78.97544200
Construction Year : 2007
Inventory Year : 2023
Work Code(s) : --

Geometric

Overall length (in meter) : 9.00
Total No of Span : 1
Maximuam Span (in meter) : 9.00
Span Arragment : 1x9
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 2147.000
OFL Ordinary Flood Level : 2144.000
LWL Low Water Level : 2142.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 2153.000
Road Level at Centre : 2153.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided