Bridge (ID- 3365 ) Inventory Report

Arsani Ghedera Uniyana On Chainage 20.875 of Ukhimath Mansoona Jugasu Raulek Uniyana motor road

Data finalized On 29 Dec 2023

By Er pawan Kumar

Last Rated On 16 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Ukhimath

General

Bridge Type : Motor Bridge High Level
Structure No : 21/2
Feature Intersected : Arsani Ghedera
Name of Bridge : Arsani Ghedera Uniyana
Nearest Town : Uniyana
Latitude (Northing) : 30.58326900
Longitude (Easting) : 79.12674700
Construction Year : 2008
Inventory Year : 2023

Geometric

Overall length (in meter) : 15.00
Total No of Span : 1
Maximuam Span (in meter) : 15.00
Span Arragment : 1x15.0
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 3.750
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1756.000
OFL Ordinary Flood Level : 1753.000
LWL Low Water Level : 1750.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 1759.000
Road Level at Centre : 1759.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided