Bridge (ID- 338 ) Inventory Report

BAIJRO BRIDGE On Chainage 140.870 of starting from its junction with NH -74 near kashipur connecting Ramnager Dhumakot Thalisain Tripalisain Pabo and Terminating at NH 119 near Bubakhal National Highway

Data finalized On 04 Jul 2023

By Mohammad Islam

Last Rated On 18 May 2024

Rating 0.33%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : NH Dhumakot

General

Bridge Type : Motor Bridge High Level
Structure No : 141/1
Feature Intersected : Local River
Name of Bridge : BAIJRO BRIDGE
Nearest Town : BAIJRO
Latitude (Northing) : 29.90693000
Longitude (Easting) : 79.02972222
Construction Year : 1970
Inventory Year : 2023

Geometric

Overall length (in meter) : 35.50
Total No of Span : 1
Maximuam Span (in meter) : 35.50
Span Arragment : 1x35.3
No of Lane : 1.000
Overall Width (m) : 4.900
Carriageway Width (m) : 4.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.400
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1253.000
OFL Ordinary Flood Level : 1249.000
LWL Low Water Level : 1248.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre : 1260.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : other
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided