Bridge (ID- 3381 ) Inventory Report

Bridle bridge Over Dhundeshwar gadhera On Chainage 6.600 of Kirtinagar Dang Dhari motor road

Data finalized On 11 Jan 2024

By Harish Prasad bhatt

Last Rated On 12 Jun 2024

Rating 0.31%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Kirtinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 7/1
Feature Intersected : Dhundeshwar gadhera
Name of Bridge : Bridle bridge Over Dhundeshwar gadhera
Nearest Town : Kirtinagar
Latitude (Northing) : 30.24955600
Longitude (Easting) : 78.75400500
Construction Year : 2005
Inventory Year : 2024

Geometric

Overall length (in meter) : 18.00
Total No of Span : 1
Maximuam Span (in meter) : 18.00
Span Arragment : 1x18
No of Lane : 1.000
Overall Width (m) : 4.250
Carriageway Width (m) : 3.750
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.2
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Protection work provide with plum concrete & walls
Bank Protection Right Side of Up-stream : Protection work provide with plum concrete & walls
Bank Protection Left Side of Down-stream : Protection work provide with plum concrete & walls
Bank Protection Right Side of Down-stream : Protection work provide with plum concrete & walls
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided