Bridge (ID- 3382 ) Inventory Report

Bridle bridge Over Sera gaad On Chainage 3.000 of Kirtingar Sera bridle road

Data finalized On 11 Jan 2024

By Harish Prasad bhatt

Last Rated On 11 Jun 2024

Rating 56.47%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Kirtinagar

General

Bridge Type : Pedestrain Bridge
Structure No : 3/1
Feature Intersected : Sera gaad
Name of Bridge : Bridle bridge Over Sera gaad
Nearest Town : Kirtinagar
Latitude (Northing) : 30.22767100
Longitude (Easting) : 78.76498500
Construction Year : 1997
Inventory Year : 2024

Geometric

Overall length (in meter) : 15.24
Total No of Span : 1
Maximuam Span (in meter) : 15.24
Span Arragment : 1x15.24
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.2
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided