Bridge (ID- 341 ) Inventory Report

SIROLI BRIDGE On Chainage 120.700 of starting from its junction with NH -74 near kashipur connecting Ramnager Dhumakot Thalisain Tripalisain Pabo and Terminating at NH 119 near Bubakhal National Highway

Data finalized On 15 Jul 2023

By ER. HARISH CHANDRA SINGH RAWAT

Last Rated On 05 Nov 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : NH Dhumakot

General

Bridge Type : Motor Bridge High Level
Structure No : 121/1
Feature Intersected : LOCAL GADHERA
Name of Bridge : SIROLI BRIDGE
Nearest Town : MAITHANAGHAT
Latitude (Northing) : 29.82162500
Longitude (Easting) : 78.06083333
Construction Year : 2023
Inventory Year : 2020

Geometric

Overall length (in meter) : 24.00
Total No of Span : 1
Maximuam Span (in meter) : 24.00
Span Arragment : 1X24
No of Lane : 1.000
Overall Width (m) : 12.000
Carriageway Width (m) : 9.000
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 5.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1300.000
OFL Ordinary Flood Level : 1296.700
LWL Low Water Level : 1296.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 1308.000
Road Level at Centre : 1310.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 1.0
Design Loading : Class 70R
Load Rating : Class 70R

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC spill through type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : plum masonry work
Bank Protection Right Side of Up-stream : plum masonry work
Bank Protection Left Side of Down-stream : plum masonry work
Bank Protection Right Side of Down-stream : plum masonry work
Floor Protection on Up-stream : rocky surface
Floor Protection on Down-stream : rocky surface
Tratment for Corrosion Protection (if any) : not applicable