Bridge (ID- 3436 ) Inventory Report

Chamkot Pedestrain bridle bridge

Data finalized On 17 May 2024

By Ganesh Chamoli

Last Rated On 05 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : PD Uttarkashi

General

Bridge Type : Pedestrain Bridge
Structure No : 1
Feature Intersected : Bhagirathi River
Name of Bridge : Chamkot Pedestrain bridle bridge
Nearest Town : Matli
Latitude (Northing) : 30.73666666
Longitude (Easting) : 78.38611111
Construction Year : 2023
Inventory Year : 2024

Geometric

Overall length (in meter) : 84.00
Total No of Span : 1
Maximuam Span (in meter) : 84.00
Span Arragment : 1*84
No of Lane : 1.000
Overall Width (m) : 2.000
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1049.380
OFL Ordinary Flood Level :
LWL Low Water Level : 1041.400
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Composite
Wearing Coat Type : Other
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided