Bridge (ID- 344 ) Inventory Report

lugar bridge On Chainage 33.225 of Kathgodam Hairakhan Sanani Bend Simaliya Bend state highway

Data finalized On 29 Nov 2022

By Er. Ved Prakash

Last Rated On 13 Jun 2024

Rating 9.17%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : PD Nainital

General

Bridge Type : Motor Bridge High Level
Structure No : 1/3
Feature Intersected : lugar river
Name of Bridge : lugar bridge
Nearest Town : haldwani
Latitude (Northing) : 29.23697780
Longitude (Easting) : 79.67700833
Construction Year :
Inventory Year : 2016

Geometric

Overall length (in meter) : 65.70
Total No of Span : 1
Maximuam Span (in meter) : 64.00
Span Arragment : 1x64
No of Lane : 1.000
Overall Width (m) : 4.700
Carriageway Width (m) : 4.150
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : plum concrete and R/wall
Bank Protection Right Side of Up-stream : plum concrete and R/wall
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : plum concrete and R/wall
Floor Protection on Down-stream : plum concrete and R/wall
Tratment for Corrosion Protection (if any) : red oxide paint