Bridge (ID- 3449 ) Inventory Report

Hyundari Tok Genwla, Bridle Bridge

Data finalized On 20 May 2024

By Vinay Kumar

Last Rated On 20 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : PD Uttarkashi

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Khurmola Gaad
Name of Bridge : Hyundari Tok Genwla, Bridle Bridge
Nearest Town : Brahamkhal
Latitude (Northing) : 30.69986830
Longitude (Easting) : 78.29432500
Construction Year : 2022
Inventory Year : 2024

Geometric

Overall length (in meter) : 40.00
Total No of Span : 1
Maximuam Span (in meter) : 40.00
Span Arragment : 1*40
No of Lane : 1.000
Overall Width (m) : 2.110
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1215.913
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : other
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided