Data finalized On 13 Jun 2024
By Er. Balendra Singh
Last Rated On 14 Jun 2024
Rating 0.00%
Categorized As
XXXXX on XX-XX-XXXX
In District : Haridwar Under Division : CD Laksar
General
Bridge Type :
Motor Bridge High Level
Structure No :
21/2
Feature Intersected :
Gebu Nala
Name of Bridge :
शाहपुर-भोगपुर-रायसी मोटर मार्ग के किमी0 21 में 60 मी0 आर0सी0सी0 बाॅक्स कल्वर्ट
Nearest Town :
Raisi
Latitude (Northing) :
29.69154600
Longitude (Easting) :
78.07158100
Construction Year :
2023
Inventory Year :
2023
Geometric
Overall length (in meter) :
60.00
Total No of Span :
13
Maximuam Span (in meter) :
60.00
Span Arragment :
1x2.92m+1x4.6m+3x5.2m+1x4.6m+1x2.92m+1x4.6m+3x5.2m+1x4.6m+1x2.92m
No of Lane :
2.000
Overall Width (m) :
12.000
Carriageway Width (m) :
7.500
RS Footpath Width (m) :
1.500
LS Footpath Width (m) :
1.500
Approch Width i/c Shoulders (m) :
12.000
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
612.825
OFL Ordinary Flood Level :
611.825
LWL Low Water Level :
611.000
Design Velocity (m/Sec) :
0.00
Design Discharge (Cumecs) :
0.00
Soffit Level at Centre :
0.000
Road Level at Centre :
0.000
Design Scour Level at Pier :
0.000
Design Scour Level at Abutments :
0.000
Exposure Condition :
Moderate
Seismic Importance factor :
1.0
Design Loading :
Class A
Load Rating :
Class A
Super-Structure
Superstructure Type :
T-beam and slab
Superstructure Material :
Reinforced concrete
Wearing Coat Type :
Cement Concrete
Expension Joint Type :
Filler
Railing/Crash Barrier type :
Pre-cast concrete
Bearing type :
Not Provided
Sub-Structure
Founding Strata :
Sandy
Abutment Foundation Type :
Pile
Pier Foundation Type :
Pile
No of Piers :
12
Abutment Type :
other
Pier Type :
RCC Solid
Protection Work
Bank Protection Left Side of Up-stream :
no protection work provided
Bank Protection Right Side of Up-stream :
no protection work provided
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
no protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided