Bridge (ID- 35 ) Inventory Report

R.C.C Bridge Over Erna Gadhera in km 06 On Chainage 6.000 of Pokhari Vishalkhal Aali Kandai motor road

Data finalized On 07 Dec 2023

By Er. Pankaj Singh Rawat

Last Rated On 24 Nov 2024

Rating 2.32%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Pokhari

General

Bridge Type : Motor Bridge High Level
Structure No : 6/1
Feature Intersected : Erna Gadhera
Name of Bridge : R.C.C Bridge Over Erna Gadhera in km 06
Nearest Town : Nagnath Pokhari
Latitude (Northing) : 30.33220000
Longitude (Easting) : 79.22612900
Construction Year : 2013
Inventory Year : 2022

Geometric

Overall length (in meter) : 6.00
Total No of Span : 1
Maximuam Span (in meter) : 6.00
Span Arragment : 1x6
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided