Bridge (ID- 3500 ) Inventory Report

Local Nala Sarquda Gaad On Chainage 0.140 of Almora Berinag Thal Muwani Chaubati Sandev Didihat Ogla state highway

Data finalized On 01 Jan 2025

By Ajay singh

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : PD Pithoragarh

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Local Nala Sarquda Gaad
Name of Bridge : Local Nala Sarquda Gaad
Nearest Town : Muwani
Latitude (Northing) : 29.75271667
Longitude (Easting) : 80.13312778
Construction Year : 1995
Inventory Year : 2024

Geometric

Overall length (in meter) : 6.90
Total No of Span : 1
Maximuam Span (in meter) : 6.90
Span Arragment : 1x6.90m
No of Lane : 1.000
Overall Width (m) : 5.250
Carriageway Width (m) : 4.200
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.250
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided