Bridge (ID- 3502 ) Inventory Report

Henwal river On Chainage 11.210 of Chaupdiyalgaon to Saud Motor Road.

Data finalized On 03 Jan 2025

By Gopal Saini

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : CD Chamba

General

Bridge Type : Motor Bridge High Level
Structure No : 11/1
Feature Intersected : Henwal river
Name of Bridge : Henwal river
Nearest Town : Saur
Latitude (Northing) : 30.40061667
Longitude (Easting) : 78.33637222
Construction Year : 2009
Inventory Year : 2022

Geometric

Overall length (in meter) : 16.00
Total No of Span : 1
Maximuam Span (in meter) : 16.00
Span Arragment : 1x16
No of Lane : 1.000
Overall Width (m) : 5.400
Carriageway Width (m) : 5.400
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.550
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 120.000
OFL Ordinary Flood Level : 110.000
LWL Low Water Level : 100.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided