Bridge (ID- 3510 ) Inventory Report

Prayageshwar

Data finalized On 15 Jan 2025

By Rakesh Chandra Arya

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : CD Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 55/7
Feature Intersected : Ramganga River
Name of Bridge : Prayageshwar
Nearest Town : Chakhutiya
Latitude (Northing) : 29.86809700
Longitude (Easting) : 79.33979800
Construction Year :
Inventory Year : 2024

Geometric

Overall length (in meter) : 8.00
Total No of Span : 6
Maximuam Span (in meter) : 8.00
Span Arragment : 1*6
No of Lane : 1.000
Overall Width (m) : 5.200
Carriageway Width (m) : 4.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.300
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level : 101.300
Design Velocity (m/Sec) : 0.00
Design Discharge (Cumecs) : 0.00
Soffit Level at Centre : 0.000
Road Level at Centre : 0.000
Design Scour Level at Pier : 0.000
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided