Bridge (ID- 352 ) Inventory Report

Bhakhra Setu On Chainage 40.000 of Ramnagar Kaladhungi Haldwani Kathgodam Chorgaliya Sitarganj Bizti state highway : .

Data finalized On 27 Sep 2021

By Er. Mohan Singh Khampa

Last Rated On 10 Nov 2023

Rating 0.59%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Haldwani

General

Bridge Type : Motor Bridge High Level
Structure No : 30x3
Feature Intersected : Bhakhra River
Name of Bridge : Bhakhra Setu
Nearest Town : Lamachaur
Latitude (Northing) : 29.22904900
Longitude (Easting) : 79.40962200
Construction Year : 2013
Inventory Year : 2021

Geometric

Overall length (in meter) : 90.00
Total No of Span : 1
Maximuam Span (in meter) : 90.00
Span Arragment : 3x30
No of Lane : 2.000
Overall Width (m) : 7.500
Carriageway Width (m) : 7.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 102.300
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Brick Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : plumb concrete
Bank Protection Right Side of Up-stream : plumb concrete
Bank Protection Left Side of Down-stream : plumb concrete
Bank Protection Right Side of Down-stream : plumb concrete
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided