Bridge (ID- 3558 ) Inventory Report

Gadigaoan ka rola bridge On Chainage 57.950 of Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway (SH)

Data Yet Not Finalized

Last Rated On 25 Oct 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Baijro

General

Bridge Type : Motor Bridge High Level
Structure No : 58/1
Feature Intersected : balal ghati nadi
Name of Bridge : Gadigaoan ka rola bridge
Nearest Town : Bungidhar
Latitude (Northing) : 29.96936500
Longitude (Easting) : 79.17466300
Construction Year : 1993
Inventory Year : 2025
Work Code(s) : ADB

Geometric

Overall length (in meter) : 6.00
Total No of Span : 2
Maximuam Span (in meter) : 6.00
Span Arragment : 2x3
No of Lane : 1.000
Overall Width (m) : 6.000
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Extreme
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Arch
Superstructure Material : Masonry
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Not Provided
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : other
Pier Foundation Type : other
No of Piers : 1
Abutment Type : other
Pier Type : other

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided