Bridge (ID- 3623 ) Inventory Report

Bhowavali Ghat Bridge On Chainage 1.400 of Lalpur Bhowavali motor road (VR)

Data finalized On 21 Apr 2026

By Dinesh Kumar

Last Rated On 04 Jun 2026

Rating 0.74%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : CD Laksar

General

Bridge Type : Motor Bridge High Level
Structure No : 2/1
Feature Intersected : Ban Ganga
Name of Bridge : Bhowavali Ghat Bridge
Nearest Town : Bhowavali
Latitude (Northing) : 29.67134722
Longitude (Easting) : 78.05147222
Construction Year : 2022
Inventory Year : 2025
Work Code(s) : --

Geometric

Overall length (in meter) : 175.00
Total No of Span : 7
Maximuam Span (in meter) : 25.00
Span Arragment : 7x25
No of Lane : 1.500
Overall Width (m) : 10.000
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.250
LS Footpath Width (m) : 1.250
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 6
Abutment Type : RCC buttressed type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided