Bridge (ID- 364 ) Inventory Report

Sawalde Bridge On Chainage 5.900 of Ramnagar Laldhang motor road (MDR)

Data finalized On 06 Dec 2022

By Girish Kumar AAE

Last Rated On 26 Jun 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Ramnagar

General

Bridge Type : Motor Bridge High Level
Structure No : 5/3
Feature Intersected : Sawalde River
Name of Bridge : Sawalde Bridge
Nearest Town : Ramnagar
Latitude (Northing) : 29.40158500
Longitude (Easting) : 79.06626900
Construction Year : 2018
Inventory Year : 2020
Work Code(s) : --

Geometric

Overall length (in meter) : 275.00
Total No of Span : 11
Maximuam Span (in meter) : 25.00
Span Arragment : 11x25m
No of Lane : 2.000
Overall Width (m) : 12.000
Carriageway Width (m) : 7.000
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 100.197
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) : 1.61
Design Discharge (Cumecs) : 2182.42
Soffit Level at Centre :
Road Level at Centre : 104.000
Design Scour Level at Pier : 8.760
Design Scour Level at Abutments : 5.560
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 10
Abutment Type : other
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : Plum Concrete
Bank Protection Right Side of Up-stream : Plum Concrete
Bank Protection Left Side of Down-stream : Plum Concrete
Bank Protection Right Side of Down-stream : Plum Concrete
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided