Bridge (ID- 370 ) Inventory Report

unison bridge On Chainage 0.250 of Unison School road to Kirsali Gaon road

Data finalized On 12 Jun 2024

By Rajjak Aehmad

Last Rated On 15 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : PD Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : local nala
Name of Bridge : unison bridge
Nearest Town : dehradun
Latitude (Northing) : 30.39862100
Longitude (Easting) : 78.07918500
Construction Year : 2018
Inventory Year : 2021

Geometric

Overall length (in meter) : 25.00
Total No of Span : 1
Maximuam Span (in meter) : 25.00
Span Arragment : 1x25.0
No of Lane : 2.000
Overall Width (m) : 12.000
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.800
LS Footpath Width (m) : 1.800
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Composite
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : plum wall protection work
Bank Protection Right Side of Up-stream : plum wall protection work
Bank Protection Left Side of Down-stream : plum wall protection work
Bank Protection Right Side of Down-stream : plum wall protection work
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided