Bridge (ID- 371 ) Inventory Report

Subhasnager to ITI 110m span Bridle suspension Bridge over pindar river

Data finalized On 09 Jan 2024

By Minakshi

Last Rated On 19 Jun 2024

Rating 1.66%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : PD Karnprayag

General

Bridge Type : Foot Over Bridge
Structure No : 232/2
Feature Intersected : pinder river
Name of Bridge : Subhasnager to ITI 110m span Bridle suspension Bridge over pindar river
Nearest Town : Karnprayag
Latitude (Northing) : 30.25256110
Longitude (Easting) : 79.50455800
Construction Year : 2020
Inventory Year : 2022

Geometric

Overall length (in meter) : 110.00
Total No of Span : 1
Maximuam Span (in meter) : 110.00
Span Arragment : 110m
No of Lane : 1.000
Overall Width (m) : 2.500
Carriageway Width (m) : 2.000
RS Footpath Width (m) : 2.500
LS Footpath Width (m) : 2.500
Approch Width i/c Shoulders (m) : 2.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 493.000
OFL Ordinary Flood Level :
LWL Low Water Level : 485.015
Design Velocity (m/Sec) :
Design Discharge (Cumecs) : 493.00
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : other

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : cement concrete plum protection work provided
Floor Protection on Up-stream : cement concrete plum protection work
Floor Protection on Down-stream : cement concrete plum protection work
Tratment for Corrosion Protection (if any) : no special treatment provided