Data finalized On 09 Jan 2024
By Minakshi
Last Rated On 19 Jun 2024
Rating 1.66%
Categorized As
XXXXX on XX-XX-XXXX
In District : Chamoli Under Division : PD Karnprayag
General
Bridge Type :
Foot Over Bridge
Structure No :
232/2
Feature Intersected :
pinder river
Name of Bridge :
Subhasnager to ITI 110m span Bridle suspension Bridge over pindar river
Nearest Town :
Karnprayag
Latitude (Northing) :
30.25256110
Longitude (Easting) :
79.50455800
Construction Year :
2020
Inventory Year :
2022
Geometric
Overall length (in meter) :
110.00
Total No of Span :
1
Maximuam Span (in meter) :
110.00
Span Arragment :
110m
No of Lane :
1.000
Overall Width (m) :
2.500
Carriageway Width (m) :
2.000
RS Footpath Width (m) :
2.500
LS Footpath Width (m) :
2.500
Approch Width i/c Shoulders (m) :
2.500
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
493.000
OFL Ordinary Flood Level :
LWL Low Water Level :
485.015
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
493.00
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
1.0
Design Loading :
Footpath Live Load
Load Rating :
Footpath Live Load
Super-Structure
Superstructure Type :
Suspension
Superstructure Material :
Steel
Wearing Coat Type :
Other
Expension Joint Type :
Other
Railing/Crash Barrier type :
Steel rolled section
Bearing type :
other
Sub-Structure
Founding Strata :
Bouldery
Abutment Foundation Type :
Open
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
RCC counterfort type
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
no protection work provided
Bank Protection Right Side of Up-stream :
protection work provided
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
cement concrete plum protection work provided
Floor Protection on Up-stream :
cement concrete plum protection work
Floor Protection on Down-stream :
cement concrete plum protection work
Tratment for Corrosion Protection (if any) :
no special treatment provided