Bridge (ID- 3754 ) Inventory Report

Rambada local gadera On Chainage 6.800 of Gaurikund Kedarnath Bridle Road (BR)

Data finalized On 29 Jul 2025

By Gaurav Nautiyal

Last Rated On 04 Jun 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Guptkashi

General

Bridge Type : Pedestrain Bridge
Structure No : 6/1
Feature Intersected : Local Gadera
Name of Bridge : Rambada local gadera
Nearest Town : Rambada
Latitude (Northing) : 30.69388889
Longitude (Easting) : 79.05361111
Construction Year : 2025
Inventory Year : 2025
Work Code(s) : --

Geometric

Overall length (in meter) : 15.00
Total No of Span : 1
Maximuam Span (in meter) : 15.00
Span Arragment : 1x15
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 4.100
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : NA

Super-Structure

Superstructure Type : Plate Girder
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : Plum Masonry work
Bank Protection Right Side of Up-stream : Plum Masonry work
Bank Protection Left Side of Down-stream : Plum Masonry work
Bank Protection Right Side of Down-stream : Plum Masonry work
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided