Bridge (ID- 378 ) Inventory Report

santala devi bridge On Chainage 3.696 of Cantt to Santla Devi Road (VR)

Data finalized On 02 Jan 2025

By Udyram

Last Rated On 27 Jun 2025

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : PD Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 4/1
Feature Intersected : Dhobakhala nallah
Name of Bridge : santala devi bridge
Nearest Town : dehradun
Latitude (Northing) : 30.39689600
Longitude (Easting) : 78.02898000
Construction Year : 2013
Inventory Year : 2021
Work Code(s) : --

Geometric

Overall length (in meter) : 36.00
Total No of Span : 1
Maximuam Span (in meter) : 36.00
Span Arragment : 1x36.00m
No of Lane : 1.500
Overall Width (m) : 6.700
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.600
LS Footpath Width (m) : 0.600
Approch Width i/c Shoulders (m) : 9.100
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Filler
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : 24 m.R/W and 27m. Plum concrete provided
Bank Protection Right Side of Up-stream : 24 m.R/W provided
Bank Protection Left Side of Down-stream : 22 m.R/W provided
Bank Protection Right Side of Down-stream : 22 m.R/W provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided