Bridge (ID- 3790 ) Inventory Report

125 m span arch motor bridge On Chainage 0.900 of Link road from KaraligateThuligad motor road to RTO office Nayakgot

Data finalized On 26 Aug 2025

By TANUJA DEV

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Champawat Under Division : PD Champawat

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Kirora naala
Name of Bridge : 125 m span arch motor bridge
Nearest Town : TANAKPUR
Latitude (Northing) : 29.08360100
Longitude (Easting) : 80.11675700
Construction Year : 2024
Inventory Year : 2025

Geometric

Overall length (in meter) : 125.00
Total No of Span : 4
Maximuam Span (in meter) : 33.00
Span Arragment : 1x28.5m+1x33m+1x33m+1x28.5m+2m dirt wall
No of Lane : 1.500
Overall Width (m) : 7.000
Carriageway Width (m) : 6.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 251.400
OFL Ordinary Flood Level : 249.000
LWL Low Water Level : 248.400
Design Velocity (m/Sec) : 2.70
Design Discharge (Cumecs) : 661.00
Soffit Level at Centre : 255.670
Road Level at Centre : 257.500
Design Scour Level at Pier : 246.690
Design Scour Level at Abutments : 246.690
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class 70R
Load Rating : Class 70R

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Pile
Pier Foundation Type : Pile
No of Piers : 3
Abutment Type : RCC Box type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : Gabions in 3 layers over plum toe walls in 2 layers in 100 m length and 1 no. spur after gabion walls.
Bank Protection Right Side of Up-stream : Gabions in 2 layers over plum toe walls in 2 layers in18 m length .
Bank Protection Left Side of Down-stream : Gabions in 3 layers over plum toe walls in 2 layers in 50 m length .
Bank Protection Right Side of Down-stream : Gabions in 2 layers over plum toe walls in 2 layers in 9 m length .
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided