Bridge (ID- 3814 ) Inventory Report

local nala On Chainage 5.500 of Modi to ChandikaGhat Padal road

Data finalized On 27 Sep 2025

By Rajesh Paintola

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : PD Pithoragarh

General

Bridge Type : Pedestrain Bridge
Structure No : 1/3
Feature Intersected : local nala
Name of Bridge : local nala
Nearest Town : Jhuni
Latitude (Northing) : 29.66305600
Longitude (Easting) : 80.18527800
Construction Year : 1986
Inventory Year : 2013

Geometric

Overall length (in meter) : 27.00
Total No of Span : 1
Maximuam Span (in meter) : 27.00
Span Arragment : 1*27
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1038.300
OFL Ordinary Flood Level : 1034.000
LWL Low Water Level : 1030.500
Design Velocity (m/Sec) : 12.00
Design Discharge (Cumecs) : 18.00
Soffit Level at Centre : 1041.500
Road Level at Centre : 1042.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 1039.000
Exposure Condition : Severe
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Reinforced concrete
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : other
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided