Bridge (ID- 3852 ) Inventory Report

changeen jajri RCC BRIDGE

Data finalized On 21 May 2026

By ASHOK KUMAR/SANTOSH

Last Rated On 26 May 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Pabo

General

Bridge Type : Motor Bridge High Level
Structure No : 4
Feature Intersected : LACAL NALA
Name of Bridge : changeen jajri RCC BRIDGE
Nearest Town : JAJARI
Latitude (Northing) : 30.09973000
Longitude (Easting) : 79.08603700
Construction Year : 2008
Inventory Year : 2026
Work Code(s) : --

Geometric

Overall length (in meter) : 12.00
Total No of Span : 1
Maximuam Span (in meter) : 12.00
Span Arragment : 1X12
No of Lane : 1.000
Overall Width (m) : 5.400
Carriageway Width (m) : 4.900
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.950
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 104.000
OFL Ordinary Flood Level : 103.000
LWL Low Water Level : 101.000
Design Velocity (m/Sec) : 2.50
Design Discharge (Cumecs) : 20.00
Soffit Level at Centre : 100.000
Road Level at Centre : 101.000
Design Scour Level at Pier : 102.000
Design Scour Level at Abutments : 105.000
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided