Bridge (ID- 3894 ) Inventory Report

डाकपत्थर बैराज से ढालीपुर पावर कैनाल सर्विस मार्ग पर सेतु (ढकरानी गांव) On Chainage 10.750 of Service road along the left bank of the Shakti Canal, extending from Dakpathar Tikona Park to the Skew Bridge at Dhalipur, within the Vikasnagar Assembly constituency. (VR)

Data Yet Not Finalized

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : CD Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 1
Feature Intersected : डाकपत्थर बैराज से ढालीपुर पावर कैनाल
Name of Bridge : डाकपत्थर बैराज से ढालीपुर पावर कैनाल सर्विस मार्ग पर सेतु (ढकरानी गांव)
Nearest Town : ढकरानी गांव
Latitude (Northing) : 30.44640833
Longitude (Easting) : 77.71547222
Construction Year : 1960
Inventory Year : 2026
Work Code(s) : --

Geometric

Overall length (in meter) : 41.00
Total No of Span : 3
Maximuam Span (in meter) : 13.66
Span Arragment : 3X13.66
No of Lane : 1.000
Overall Width (m) : 4.600
Carriageway Width (m) : 4.600
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 4.600
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Stone Masonry
Pier Type : Stone Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided