Bridge (ID- 42 ) Inventory Report

Betalghat Bridge On Chainage 34.075 of Garjiya (Ghughutiyadhar) Betalghat Kharana Dhokana Odakhan Pasyapani Bhateliya Mukteshwar state highway

Data finalized On 26 Aug 2022

By RAKESH CHANDRA ARYA

Last Rated On 29 Nov 2024

Rating 6.39%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Nainital

General

Bridge Type : Motor Bridge High Level
Structure No : 35/1
Feature Intersected : Kosi River
Name of Bridge : Betalghat Bridge
Nearest Town : Betalghat
Latitude (Northing) : 29.55647500
Longitude (Easting) : 79.34528000
Construction Year : 1989
Inventory Year : 2020

Geometric

Overall length (in meter) : 70.00
Total No of Span : 1
Maximuam Span (in meter) : 70.00
Span Arragment : 1x70
No of Lane : 1.000
Overall Width (m) : 4.850
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Box girder
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided