Bridge (ID- 43 ) Inventory Report

JUI BRIDGE On Chainage 0.750 of Kartiya Jui motor road (VR)

Data finalized On 13 Oct 2022

By DEEPENDRA RAWAT AAE

Last Rated On 08 Jul 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Dugadda

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : MANDAL RIVER
Name of Bridge : JUI BRIDGE
Nearest Town : KARTIYA
Latitude (Northing) : 29.66016000
Longitude (Easting) : 78.87922000
Construction Year : 2010
Inventory Year : 2021
Work Code(s) : --

Geometric

Overall length (in meter) : 100.00
Total No of Span : 5
Maximuam Span (in meter) : 20.00
Span Arragment : 20x5
No of Lane : 1.000
Overall Width (m) : 4.250
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 4
Abutment Type : RCC buttressed type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided