Bridge (ID- 438 ) Inventory Report

Jhajra Bridge On Chainage 0.150 of Vidyamata Rajrani road (Jhajra to ThakurPur)

Data finalized On 20 Feb 2024

By Er. Maan Singh

Last Rated On 14 May 2024

Rating 0.29%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : CD Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 5/1
Feature Intersected : Tons River
Name of Bridge : Jhajra Bridge
Nearest Town : Jhajra
Latitude (Northing) : 30.34027778
Longitude (Easting) : 77.91944444
Construction Year : 2011
Inventory Year : 2021

Geometric

Overall length (in meter) : 275.00
Total No of Span : 11
Maximuam Span (in meter) : 25.00
Span Arragment : 11x25
No of Lane : 2.000
Overall Width (m) : 11.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.600
LS Footpath Width (m) : 1.600
Approch Width i/c Shoulders (m) : 11.500
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Reinforced Elastomeric Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 9
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided