Bridge (ID- 45 ) Inventory Report

MALAN BRIDGE On Chainage 8.000 of Chillarkhal Sigaddi Kotdwar Pakhro motor road

Data finalized On 13 Oct 2022

By PRADEEP MAMGAIN AAE

Last Rated On 06 May 2024

Rating 5.62%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Dugadda

General

Bridge Type : Motor Bridge High Level
Structure No : 8/1
Feature Intersected : MALAN RIVER
Name of Bridge : MALAN BRIDGE
Nearest Town : KOTDWAR
Latitude (Northing) : 29.79250000
Longitude (Easting) : 78.45806000
Construction Year : 2015
Inventory Year : 2021

Geometric

Overall length (in meter) : 325.00
Total No of Span : 13
Maximuam Span (in meter) : 25.00
Span Arragment : 25x13
No of Lane : 2.000
Overall Width (m) : 12.000
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 11.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Voided slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 11
Abutment Type : other
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided