Bridge (ID- 456 ) Inventory Report

Lewara On Chainage 57.600 of Nainital Kaladhungi Bajpur Doraha state highway (SH)

Data finalized On 14 Jan 2022

By Rajesh Paintola

Last Rated On 08 May 2026

Rating 0.50%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Kashipur

General

Bridge Type : Motor Bridge High Level
Structure No : 1/4
Feature Intersected : Lewara River
Name of Bridge : Lewara
Nearest Town : Bazpur
Latitude (Northing) : 29.09000000
Longitude (Easting) : 79.09000000
Construction Year : 2016
Inventory Year : 2020
Work Code(s) : --

Geometric

Overall length (in meter) : 21.00
Total No of Span : 2
Maximuam Span (in meter) : 21.00
Span Arragment : 2*10.5
No of Lane : 4.000
Overall Width (m) : 18.000
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 18.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Modular Strip/Box Seal Joints
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Hard clayey
Abutment Foundation Type : Raft
Pier Foundation Type : Raft
No of Piers : 3
Abutment Type : RCC Box type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : Plum concrete Blocks
Bank Protection Right Side of Up-stream : Plum concrete Blocks
Bank Protection Left Side of Down-stream : Plum concrete Blocks
Bank Protection Right Side of Down-stream : Plum concrete Blocks
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided