Bridge (ID- 477 ) Inventory Report

55.00 Mtr litgariya Pedestrain Bridge

Data finalized On 20 Aug 2022

By Er. Pankaj Patwa

Last Rated On 27 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : CD Kapkot

General

Bridge Type : Pedestrain Bridge
Structure No : 3/1
Feature Intersected : Litgariya Garh
Name of Bridge : 55.00 Mtr litgariya Pedestrain Bridge
Nearest Town : Liti Gauv
Latitude (Northing) : 30.02146345
Longitude (Easting) : 80.03698105
Construction Year : 2010
Inventory Year : 2010

Geometric

Overall length (in meter) : 55.00
Total No of Span : 1
Maximuam Span (in meter) : 55.00
Span Arragment : 1x55
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1643.000
OFL Ordinary Flood Level : 1642.500
LWL Low Water Level : 1642.000
Design Velocity (m/Sec) : 6.00
Design Discharge (Cumecs) : 400.00
Soffit Level at Centre : 1647.250
Road Level at Centre : 1648.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : other

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum Concrete Block
Bank Protection Right Side of Up-stream : Plum Concret
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : Plum Concret
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided