Bridge (ID- 518 ) Inventory Report

30.00 mtr span Jalmani Bridge On Chainage 51.200 of Dangoli Sailani Darimkhet Hadbar Pandrahpali Balighat Dofad Dhramghar Kotmanya Pankhu Thal Satsiling state highway

Data finalized On 06 Aug 2022

By Jagdish Papney

Last Rated On 09 Jun 2024

Rating 3.19%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : CD Kapkot

General

Bridge Type : Motor Bridge High Level
Structure No : 89/1
Feature Intersected : jalmani Gadhera
Name of Bridge : 30.00 mtr span Jalmani Bridge
Nearest Town : Bhulgaw
Latitude (Northing) : 29.88335300
Longitude (Easting) : 79.96911300
Construction Year : 1982
Inventory Year : 2010

Geometric

Overall length (in meter) : 30.00
Total No of Span : 1
Maximuam Span (in meter) : 30.00
Span Arragment : 1x30.00
No of Lane : 1.000
Overall Width (m) : 4.250
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1103.000
OFL Ordinary Flood Level : 1100.750
LWL Low Water Level : 1100.000
Design Velocity (m/Sec) : 6.00
Design Discharge (Cumecs) : 1000.00
Soffit Level at Centre : 1106.800
Road Level at Centre : 1108.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum Concreet
Bank Protection Right Side of Up-stream : Plum Concreet
Bank Protection Left Side of Down-stream : Plum Concreet
Bank Protection Right Side of Down-stream : Plum Concreet
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided