Bridge (ID- 532 ) Inventory Report

Radhakantpur On Chainage 1.700 of Radhakantpur-Lakhipur Road

Data finalized On 09 Jun 2022

By Er.Ajay Tamta

Last Rated On 12 Dec 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : PD Rudrapur

General

Bridge Type : Motor Bridge High Level
Structure No : 1/2
Feature Intersected : Aandhua River
Name of Bridge : Radhakantpur
Nearest Town : Radhakantpur
Latitude (Northing) : 29.06333333
Longitude (Easting) : 79.33722220
Construction Year : 1981
Inventory Year : 2021

Geometric

Overall length (in meter) : 9.00
Total No of Span : 1
Maximuam Span (in meter) : 10.20
Span Arragment : 1*9
No of Lane : 1.000
Overall Width (m) : 8.000
Carriageway Width (m) : 3.750
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Other
Expension Joint Type : Reinforced Elastomeric Joint
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided