Bridge (ID- 537 ) Inventory Report

praim puri On Chainage 107.670 of Bikhyasain Deghat Bungidhar Mehalchori Bachuwaban Chokhutiya state highway

Data finalized On 31 Oct 2022

By Er. Lalit Singh Sirari

Last Rated On 15 Nov 2023

Rating 2.38%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : CD Ranikhet

General

Bridge Type : Pedestrain Bridge
Structure No : 108/1
Feature Intersected : Ramganga
Name of Bridge : praim puri
Nearest Town : praim puri
Latitude (Northing) : 29.88071667
Longitude (Easting) : 79.37296667
Construction Year : 1985
Inventory Year : 2020

Geometric

Overall length (in meter) : 45.00
Total No of Span : 1
Maximuam Span (in meter) : 43.00
Span Arragment : 1x43
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.700
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 940.400
OFL Ordinary Flood Level : 939.500
LWL Low Water Level : 939.200
Design Velocity (m/Sec) :
Design Discharge (Cumecs) : 0.00
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : plum 9.00 mtr
Bank Protection Right Side of Up-stream : wire create 9.00 mtr
Bank Protection Left Side of Down-stream : plum and r/w 10.00 mtr
Bank Protection Right Side of Down-stream : no protecion work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided