Bridge (ID- 556 ) Inventory Report

Bour Bridge at Bour River On Chainage 34.300 of Nainital Kaladhungi Bajpur Doraha state highway

Data finalized On 06 Dec 2022

By Nazim Husain AAE

Last Rated On 18 Nov 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Ramnagar

General

Bridge Type : Motor Bridge High Level
Structure No : 35/1
Feature Intersected : Bour River
Name of Bridge : Bour Bridge at Bour River
Nearest Town : Kaladhungi
Latitude (Northing) : 29.29600000
Longitude (Easting) : 79.33490000
Construction Year : 1986
Inventory Year : 2021

Geometric

Overall length (in meter) : 32.00
Total No of Span : 1
Maximuam Span (in meter) : 32.00
Span Arragment : 1x32m
No of Lane : 1.000
Overall Width (m) : 3.750
Carriageway Width (m) : 0.600
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Box girder
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Not Provided
Bearing type : other

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided