Bridge (ID- 59 ) Inventory Report

KHO BRIDGE On Chainage 2.000 of Kotdwar-Station Malgodam Road

Data finalized On 13 Oct 2022

By SANTOSH BHARDWAJ AAE

Last Rated On 09 May 2024

Rating 3.20%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : CD Dugadda

General

Bridge Type : Motor Bridge High Level
Structure No : 2/1
Feature Intersected : KHO RIVER
Name of Bridge : KHO BRIDGE
Nearest Town : KOTDWAR
Latitude (Northing) : 29.74138889
Longitude (Easting) : 78.52666667
Construction Year : 2010
Inventory Year : 2021

Geometric

Overall length (in meter) : 100.00
Total No of Span : 25
Maximuam Span (in meter) : 25.00
Span Arragment : 25x4
No of Lane : 1.500
Overall Width (m) : 12.000
Carriageway Width (m) : 10.900
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 3
Abutment Type : other
Pier Type : RCC Hollow

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided