Bridge (ID- 633 ) Inventory Report

himmatpur nala box culvert On Chainage 4.500 of Ramnagar Laldhang motor road

Data finalized On 06 Dec 2022

By Girish Kumar AAE

Last Rated On 26 Oct 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Nanital Under Division : CD Ramnagar

General

Bridge Type : Motor Bridge High Level
Structure No : 4/3
Feature Intersected : himmatpur nala
Name of Bridge : himmatpur nala box culvert
Nearest Town : ramnagar
Latitude (Northing) : 29.39903611
Longitude (Easting) : 79.07648611
Construction Year : 2020
Inventory Year : 2021

Geometric

Overall length (in meter) : 8.00
Total No of Span : 1
Maximuam Span (in meter) : 8.00
Span Arragment : 1x10m
No of Lane : 2.000
Overall Width (m) : 8.000
Carriageway Width (m) : 7.000
RS Footpath Width (m) : 0.600
LS Footpath Width (m) : 0.600
Approch Width i/c Shoulders (m) : 9.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided