Bridge (ID- 634 ) Inventory Report

Local nala On Chainage 5.600 of Connects Sahjahanpur, Bisalpur, Barkhera, Pilibhit, Neoria Husainpur, Majhola, Chanda, Mundeli and Khatima in the state of Uttar Pardesh and Uttrakhand : .

Data finalized On 27 Feb 2022

By prakash singh

Last Rated On 11 Nov 2023

Rating 1.35%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Khatima

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Local River
Name of Bridge : Local nala
Nearest Town : Khatima
Latitude (Northing) : 28.88400300
Longitude (Easting) : 79.89711700
Construction Year : 1976
Inventory Year : 2021

Geometric

Overall length (in meter) : 24.00
Total No of Span : 3
Maximuam Span (in meter) : 24.00
Span Arragment : 1x4.5+1x12+1x4.5
No of Lane : 2.000
Overall Width (m) : 8.800
Carriageway Width (m) : 6.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : other

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : RCC buttressed type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided