Bridge (ID- 645 ) Inventory Report

Parveen River Bridge On Chainage 42.380 of Jhankat Biriya Sripur Bichhuwa Bigrabagh Chakarpur Kalapul Jhankaiya Mudeli Satrahamil-Nanaksagar state highway : Jhankat Biria Shreepur Bichuva Bigrabagh Chakarpur Lalkothi road

Data finalized On 25 Feb 2022

By Er. Girish Chandra Lohani

Last Rated On 18 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Khatima

General

Bridge Type : Motor Bridge High Level
Structure No : 43/1
Feature Intersected : Parveen River
Name of Bridge : Parveen River Bridge
Nearest Town : Khatima
Latitude (Northing) : 28.86378500
Longitude (Easting) : 79.88472700
Construction Year : 2020
Inventory Year : 2021

Geometric

Overall length (in meter) : 45.00
Total No of Span : 2
Maximuam Span (in meter) : 22.50
Span Arragment : 2x22.50m
No of Lane : 2.000
Overall Width (m) : 8.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 9.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class AA
Load Rating : Class AA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 1
Abutment Type : RCC Box type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided