Bridge (ID- 655 ) Inventory Report

Baais pul RCC T Beam bridge On Chainage 8.900 of Khatima Melaghat Banmohaliya state highway : Khatima Melaghat Banmaholia road (SH)

Data finalized On 29 Sep 2026

By Prakash Singh

Last Rated On 19 May 2026

Rating 0.37%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Khatima

General

Bridge Type : Motor Bridge High Level
Structure No : 9/3
Feature Intersected : Irrigation Channel
Name of Bridge : Baais pul RCC T Beam bridge
Nearest Town : Khatima
Latitude (Northing) : 28.86616400
Longitude (Easting) : 80.03533900
Construction Year : 1975
Inventory Year : 2021
Work Code(s) : ADB

Geometric

Overall length (in meter) : 33.00
Total No of Span : 3
Maximuam Span (in meter) : 11.00
Span Arragment : 1x9.0+1x11+1x9.0
No of Lane : 2.000
Overall Width (m) : 9.000
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 2
Abutment Type : RCC buttressed type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided